Monterey Peninsula College Bridge20200609162250
Monterey Peninsula College Bridge
When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of their campus they turned to Hohbach-Lewin to act as ...
Trace Elementary School20200508202655
Trace Elementary School
Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
Pioneer Bookstore, CSU East Bay20200508180745
Pioneer Bookstore, CSU East Bay
The building is sited over an existing loading dock between the student union and library. The design features a full height window at the western exp...
Stanford Roble Gymnasium20200507203612
Stanford Roble Gymnasium
Structural challenges included qualifying and improving the existing arcades and strengthening the existing diaphragms, while respecting the historic ...
Santa Barbara Community College20200507203541
Santa Barbara Community College
The structural framing system consists of concrete filled metal decking supported by a structural steel frame. It is braced by Special Steel Moment Fr...
Mission Community College Health and Wellness Center20200507203506
Mission Community College Health and Wellness Center
The main program includes: a Fitness Studio, Dance Studio, Weight Training Facility, and a Specialized Equipment Lab (for Adaptive PE). ...
College of Canyons Science Building20200507203442
College of Canyons Science Building
The project consists of a new science and lecture building, four stories high and approximately 47,000SF of new construction. Because the building is ...
Sequoia High School Building A and Parking Lot20200507203235
Sequoia High School Building A and Parking Lot
Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new parking lot and storm drain u...
Sequoia High School Tea Garden20200507203209
Sequoia High School Tea Garden
Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Mabel Mattos Elementary20200507203146
Mabel Mattos Elementary
Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely with the City of Milpitas an...