Sequoia High School Tea Garden

Sequoia High School Tea Garden

Redwood City, California

Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. We had the pleasure to help the district with the Sequoia High School faculty and the school’s alumni group to renovate and restore their Japanese Tea Garden.

The Tea Garden, originally part of the Dingee Estate, was built in the late 1800s. When the school district acquired the property, they designed the school around the garden, recognizing it as a valuable resource for students and faculty.

Hohbach-Lewin, Inc worked with the project team to provide easy-to-maintain improvements for the Tea Garden, including pathway renovations which meet ADA standards, positive site drainage, utility improvements and renovation or restoration of many of the Garden features including the gazebo, bridge, seating, and water feature.

CSU East Bay, Pioneer Heights Student Housing, Phases II & III20200507195521

CSU East Bay, Pioneer Heights Student Housing, Phases II & III

Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Funded by Proposition 47, thi...
Oregon Coast Community College20200507195609

Oregon Coast Community College

The Central County Campus is a LEED Certified, $16.5 million, 77,000 SF facility in Newport, Oregon....
Santa Clara University – College of Arts, Sciences and Communication20200507195657

Santa Clara University – College of Arts, Sciences and Communication

A new 65,000 SF, two-story steel braced frame building on the Santa Clara University campus....
Stanford Institute for Economic Policy Research20200507195827

Stanford Institute for Economic Policy Research

Hohbach-Lewin, Inc. provided structural engineering services for the recently opened John A. & Cynthia Fry Gunn Building for ...
Abraham Lincoln High School20200507200308

Abraham Lincoln High School

The project included a new $15M, two-story steel moment resisting frame building which replaces 26 tired and time worn re-loc...
Berryessa Youth Center20200507200340

Berryessa Youth Center

This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
Capuchino High School20200507200419

Capuchino High School

Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Fremont High School Modernization & Expansion20200507200501

Fremont High School Modernization & Expansion

In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin provided the structural ...
La Entrada MS Gymnasium20200507200536

La Entrada MS Gymnasium

This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses for roof framing members a...
Lincoln High School20200507200616

Lincoln High School

The modernization scope renovated the Theater Building, while the new construction included a new two story classroom buildin...
Sequoia High School Gymnasium20200507200707

Sequoia High School Gymnasium

The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achieve USGBC LEED Gold status....
St. Francis Performing Arts Center20200507200744

St. Francis Performing Arts Center

The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
UCLA Harbor Medical Center Parking Garage20200507202320

UCLA Harbor Medical Center Parking Garage

Hohbach-Lewin, Inc. provided structural design for this new 500 car pre-cast concrete parking garage constructed with pre-cas...
Historic Hoover Middle School20200507202700

Historic Hoover Middle School

This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based...
Mabel Mattos Elementary20200507203146

Mabel Mattos Elementary

Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Sequoia High School Building A and Parking Lot20200507203235

Sequoia High School Building A and Parking Lot

Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
McCandless Roadway Improvements20200507203253

McCandless Roadway Improvements

McCandless Roadway improvements included new alignment of the roadway to accommodate a new right turn lane for the school and...
Cinnamon Court20200507203357

Cinnamon Court

Design challenges included a dramatic cantilever at the second story master bedroom, a “floating” walkway above the main livi...
Kaspick Wine Cellar20200507203428

Kaspick Wine Cellar

For this backyard wine cellar and entertainment space, Hohbach-Lewin supported the Hayes Group with Excavation Shoring, Struc...
College of Canyons Science Building20200507203442

College of Canyons Science Building

The project consists of a new science and lecture building, four stories high and approximately 47,000SF of new construction....
Mission Community College Health and Wellness Center20200507203506

Mission Community College Health and Wellness Center

The main program includes: a Fitness Studio, Dance Studio, Weight Training Facility, and a Specialized Equipment Lab (for Ada...
Santa Barbara Community College20200507203541

Santa Barbara Community College

The structural framing system consists of concrete filled metal decking supported by a structural steel frame. It is braced b...
Stanford Roble Gymnasium20200507203612

Stanford Roble Gymnasium

Structural challenges included qualifying and improving the existing arcades and strengthening the existing diaphragms, while...
Pioneer Bookstore, CSU East Bay20200508180745

Pioneer Bookstore, CSU East Bay

The building is sited over an existing loading dock between the student union and library. The design features a full height ...
Trace Elementary School20200508202655

Trace Elementary School

Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
Monterey Peninsula College Bridge20200609162250

Monterey Peninsula College Bridge

When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of their campus they turned to...
Howard Elementary School20200609170856

Howard Elementary School

Howard Elementary School is a new technology immersion school in Eugene, Oregon, with an emphasis on integrating new technolo...
Harker School20200609171125

Harker School

The New Harker School Performing Arts Center and Gymnasium located on the Upper School Campus in San Jose opened to great fan...
Menlo Atherton High School20200609171604

Menlo Atherton High School

This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Lane Community College20200609174059

Lane Community College

An extensive renovation of Lane Community College’s 97,000 SF Center Building was completed in 2016 to create the Center for ...
Milpitas Sport Center Pool Improvements20200609180851

Milpitas Sport Center Pool Improvements

We designed a drainage system which was invisible, it actually just looks like an expansion joint in the flatwork. ...
Bramhall Park20200609181517

Bramhall Park

Hohbach-Lewin provided the structural and civil engineering design on a new public concession-restroom-storage building of co...
Pilarcitos Continuation School20200609182130

Pilarcitos Continuation School

The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Hatch Elementary School20200609183142

Hatch Elementary School

Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Cunha Middle School20200609183459

Cunha Middle School

Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Brokaw Plaza Shopping Center20200609183805

Brokaw Plaza Shopping Center

The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Montrose West and East Apartments20191106185544

Montrose West and East Apartments

Perched along the busy El Camino Real thoroughfare, the Montrose West and East Apartments were another successful integrated ...
Spenger’s and 4th Street Retail20201119162019

Spenger’s and 4th Street Retail

Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...
Peabody Stadium20201119174616

Peabody Stadium

Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin provided full structural engi...
441 Page Mill20210817162129

441 Page Mill

This eye catching, mixed-use, 3-story building near the busy Palo Alto intersection of Page Mill and El Camino was yet anothe...
Hyundai of Elk Grove20200507191519

Hyundai of Elk Grove

Hohbach-Lewin structural and civil engineering teamed up with Wagner Architecture Group and Tilton Pacific Construction to pr...
Oak Grove Elementary School20230623162304

Oak Grove Elementary School

Hohbach-Lewin Eugene provided structural engineering design for Oak Grove Elementary school, a newly constructed campus for t...
El Rodeo Elementary School20241009181427

El Rodeo Elementary School

The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to...
College of the Canyons20241101210821

College of the Canyons

Hohbach-Lewin provided structural engineering design for the Takeda Science and Lecture Building and the Student Services Bui...
Del Oro High School20241101212636

Del Oro High School

Del Oro High School features a brand new campus in Bakersfield that contains an admin building, performing arts center, gym, ...
Load more