Safeway Expansion and Renovation
Berkeley, California
The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this extensive renovation project. The project scope included a significant expansion and seismic upgrade to this existing urban grocery store. Hohbach-Lewin is working on several Safeway and/or Vons store projects which are in various stages of design or construction. In conformance with Safeway corporate standards, all new design documents are produced across all disciplines via the utilization of 3-D REVIT modeling software.
The project Architect was Lowney Architecture (Oakland, CA)
More Projects Like This
- All
- Academic
- Academic-Higher Education
- Accessory Dwelling Unit
- Affordable Housing
- Civil Engineering
- Concrete Mid-Rise
- Data
- Health Care
- Higher Education
- Hospitality
- K-12 Schools
- LEED Certified
- Mixed-Use
- Multi-Residential
- Municipal
- Northern California
- Office Buildings
- Oregon
- Parking Structures
- Protective Services
- Residential
- Retail
- Seismic Retrofits
- Shoring
- Single Family
- Southern California
- Special Projects
- Structural Engineering
Pillar Point Harbor Village20200507200037
Pillar Point Harbor Village
Hohbach-Lewin collaborated with architectural firm Jacobsen & Associates to design the 90,000 sf 3-story Oceano Hotel Buildin...
Capuchino High School20200507200419
Capuchino High School
Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Creek Bridge Village20200507200904
Creek Bridge Village
This project includes Multi-story luxury apartments over Retail spaces....
Crescent Village Town Center East and West Villages20220507200931
Crescent Village Town Center East and West Villages
The first and second floor levels are concrete post-tensioned slabs that support the 4-levels of wood framed housing above....
Abgenix20200507201830
BMW of Mountain View20200507202212
BMW of Mountain View
This new three-story 120,000 square foot parking garage will house onsite automobile storage for the dealership. The structur...
City Toyota Car Dealership20200507202245
City Toyota Car Dealership
This new car dealership consists of a two story, 41,000 SF showroom with a four story, 168,000 square foot parking structure ...
Lexus Serramonte20200507202301
Lexus Serramonte
Using a design-build delivery platform, San Jose Construction worked closely with Hohbach-Lewin and Avanessian Associates to ...
Charleston Plaza20200507202412
Charleston Plaza
This new, 130,000 square foot center in Mountain View, includes a new Best Buy, REI and Bed Bath & Beyond as its major tenant...
Nut Tree Retail Center20200507202448
Nut Tree Retail Center
This 325,000 square foot retail and office “power center” sits on 30 acres where the renowned Nut Tree road stop previously s...
Pacific Commons Regional Retail Center20200507202504
Pacific Commons Regional Retail Center
Hohbach-Lewin completed the design for this new 400,000 square foot “super fast-track” retail center in under three months fr...
The Plant20200507202521
Vons20200507202549
Stanford University, Crothers Memorial Hall20200507202615
Stanford University, Crothers Memorial Hall
By utilizing performance based techniques, Hohbach-Lewin was able to devise a scheme which eliminated the need for both of th...
Historic Hoover Middle School20200507202700
Historic Hoover Middle School
This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based...
Marin Executive Center20200507202728
Marin Executive Center
The retrofit solution largely consisted of the construction of exterior buttresses which served the dual function of providin...
Santa Ana State Office Building20200507202754
Santa Ana State Office Building
Four distinctly different seismic retrofit strategies were investigated, with the exterior concrete buttress shear wall schem...
Stent Hall, Menlo School20200507202808
Stent Hall, Menlo School
This existing 3-story historic concrete mansion now functions as the administration building for Menlo School. To seismically...
Glendale City Center20200507202827
Glendale City Center
A dynamic analysis was performed on this structure in order to accurately model the structure’s expected performance when exp...
Phelan Building20200507202850
Phelan Building
Hohbach-Lewin, Inc. performed a non-linear performance based analysis of this historic 1908 San Francisco landmark structure....
Brokaw Plaza Shopping Center20200609183805
Brokaw Plaza Shopping Center
The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Peter Pan BMW Service Center20201007195743
Peter Pan BMW Service Center
The existing warehouse structure was expanded to add the services a bay, Display Center and a drive-in drop off area....
Stevens Creek Volkswagon20201007200047
Stevens Creek Volkswagon
In conjunction with the contractors, Hohbach-Lewin was able to develop a structural system that met the owner’s aggressive co...
CityLine Sunnyvale AMC and Whole Foods20201007200728
CityLine Sunnyvale AMC and Whole Foods
Included in this multiuse 36 acre development is a new two story retail facility and associated renovated parking structure w...
Station 1300 Shoring20201007201747
Station 1300 Shoring
To accomplish excavating the 450,000 Cubic Yards of dirt, temporary shoring was required to stabilize neighboring structures,...
Spenger’s and 4th Street Retail20201119162019
Spenger’s and 4th Street Retail
Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...
El Rodeo Elementary School20241009181427
El Rodeo Elementary School
The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to...
Load more