Menlo Atherton High School
Menlo Park, California
This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constructed of concrete over steel deck over steel beams supported by steel columns and is laterally braced by steel braced frames. This building includes special architectural features such as a multi-story glass entry wall with two story lobby, acoustically separated musical practice rooms, an interior high bay gallery space surrounded by railings and a stepped first floor level. Hohbach-Lewin assisted Kevin Hart Architecture and Vance Brown, the architect and contractor respectively for this project.
More Projects Like This
- All
- Academic
- Academic-Higher Education
- Accessory Dwelling Unit
- Affordable Housing
- Civil Engineering
- Concrete Mid-Rise
- Data
- Health Care
- Higher Education
- Hospitality
- K-12 Schools
- LEED Certified
- Mixed-Use
- Multi-Residential
- Municipal
- Northern California
- Office Buildings
- Oregon
- Parking Structures
- Protective Services
- Residential
- Retail
- Seismic Retrofits
- Shoring
- Single Family
- Southern California
- Special Projects
- Structural Engineering
CSU East Bay, Pioneer Heights Student Housing, Phases II & III20200507195521
CSU East Bay, Pioneer Heights Student Housing, Phases II & III
Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Funded by Proposition 47, thi...
Oregon Coast Community College20200507195609
Oregon Coast Community College
The Central County Campus is a LEED Certified, $16.5 million, 77,000 SF facility in Newport, Oregon....
Santa Clara University – College of Arts, Sciences and Communication20200507195657
Santa Clara University – College of Arts, Sciences and Communication
A new 65,000 SF, two-story steel braced frame building on the Santa Clara University campus....
Stanford Institute for Economic Policy Research20200507195827
Stanford Institute for Economic Policy Research
Hohbach-Lewin, Inc. provided structural engineering services for the recently opened John A. & Cynthia Fry Gunn Building for ...
Abraham Lincoln High School20200507200308
Abraham Lincoln High School
The project included a new $15M, two-story steel moment resisting frame building which replaces 26 tired and time worn re-loc...
Berryessa Youth Center20200507200340
Berryessa Youth Center
This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
Capuchino High School20200507200419
Capuchino High School
Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Fremont High School Modernization & Expansion20200507200501
Fremont High School Modernization & Expansion
In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin provided the structural ...
La Entrada MS Gymnasium20200507200536
La Entrada MS Gymnasium
This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses for roof framing members a...
Lincoln High School20200507200616
Lincoln High School
The modernization scope renovated the Theater Building, while the new construction included a new two story classroom buildin...
Sequoia High School Gymnasium20200507200707
Sequoia High School Gymnasium
The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achieve USGBC LEED Gold status....
St. Francis Performing Arts Center20200507200744
St. Francis Performing Arts Center
The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
UCLA Harbor Medical Center Parking Garage20200507202320
UCLA Harbor Medical Center Parking Garage
Hohbach-Lewin, Inc. provided structural design for this new 500 car pre-cast concrete parking garage constructed with pre-cas...
Historic Hoover Middle School20200507202700
Historic Hoover Middle School
This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based...
Mabel Mattos Elementary20200507203146
Mabel Mattos Elementary
Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Sequoia High School Tea Garden20200507203209
Sequoia High School Tea Garden
Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Sequoia High School Building A and Parking Lot20200507203235
Sequoia High School Building A and Parking Lot
Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
College of Canyons Science Building20200507203442
College of Canyons Science Building
The project consists of a new science and lecture building, four stories high and approximately 47,000SF of new construction....
Mission Community College Health and Wellness Center20200507203506
Mission Community College Health and Wellness Center
The main program includes: a Fitness Studio, Dance Studio, Weight Training Facility, and a Specialized Equipment Lab (for Ada...
Santa Barbara Community College20200507203541
Santa Barbara Community College
The structural framing system consists of concrete filled metal decking supported by a structural steel frame. It is braced b...
Stanford Roble Gymnasium20200507203612
Stanford Roble Gymnasium
Structural challenges included qualifying and improving the existing arcades and strengthening the existing diaphragms, while...
Pioneer Bookstore, CSU East Bay20200508180745
Pioneer Bookstore, CSU East Bay
The building is sited over an existing loading dock between the student union and library. The design features a full height ...
Trace Elementary School20200508202655
Trace Elementary School
Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
Monterey Peninsula College Bridge20200609162250
Monterey Peninsula College Bridge
When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of their campus they turned to...
Howard Elementary School20200609170856
Howard Elementary School
Howard Elementary School is a new technology immersion school in Eugene, Oregon, with an emphasis on integrating new technolo...
Harker School20200609171125
Harker School
The New Harker School Performing Arts Center and Gymnasium located on the Upper School Campus in San Jose opened to great fan...
Lane Community College20200609174059
Lane Community College
An extensive renovation of Lane Community College’s 97,000 SF Center Building was completed in 2016 to create the Center for ...
Pilarcitos Continuation School20200609182130
Pilarcitos Continuation School
The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Hatch Elementary School20200609183142
Hatch Elementary School
Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Cunha Middle School20200609183459
Cunha Middle School
Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Peabody Stadium20201119174616
Peabody Stadium
Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin provided full structural engi...
Oak Grove Elementary School20230623162304
Oak Grove Elementary School
Hohbach-Lewin Eugene provided structural engineering design for Oak Grove Elementary school, a newly constructed campus for t...
El Rodeo Elementary School20241009181427
El Rodeo Elementary School
The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to...
College of the Canyons20241101210821
College of the Canyons
Hohbach-Lewin provided structural engineering design for the Takeda Science and Lecture Building and the Student Services Bui...
Del Oro High School20241101212636
Del Oro High School
Del Oro High School features a brand new campus in Bakersfield that contains an admin building, performing arts center, gym, ...
Load more