Lincoln High School
San Jose, California
The modernization scope renovated the Theater Building, while the new construction included a new two story classroom building, a new storage building, and two unique sculptured free standing steel framed shade entry structures.
More Projects Like This
- All
- Academic
- Academic-Higher Education
- Accessory Dwelling Unit
- Affordable Housing
- Civil Engineering
- Concrete Mid-Rise
- Data
- Health Care
- Higher Education
- Hospitality
- K-12 Schools
- LEED Certified
- Mixed-Use
- Multi-Residential
- Municipal
- Northern California
- Office Buildings
- Oregon
- Parking Structures
- Protective Services
- Residential
- Retail
- Seismic Retrofits
- Shoring
- Single Family
- Southern California
- Special Projects
- Structural Engineering
Abraham Lincoln High School20200507200308
Abraham Lincoln High School
The project included a new $15M, two-story steel moment resisting frame building which replaces 26 tired and time worn re-loc...
Berryessa Youth Center20200507200340
Berryessa Youth Center
This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
Capuchino High School20200507200419
Capuchino High School
Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Fremont High School Modernization & Expansion20200507200501
Fremont High School Modernization & Expansion
In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin provided the structural ...
La Entrada MS Gymnasium20200507200536
La Entrada MS Gymnasium
This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses for roof framing members a...
Sequoia High School Gymnasium20200507200707
Sequoia High School Gymnasium
The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achieve USGBC LEED Gold status....
St. Francis Performing Arts Center20200507200744
St. Francis Performing Arts Center
The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
Historic Hoover Middle School20200507202700
Historic Hoover Middle School
This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based...
Mabel Mattos Elementary20200507203146
Mabel Mattos Elementary
Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Sequoia High School Tea Garden20200507203209
Sequoia High School Tea Garden
Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Sequoia High School Building A and Parking Lot20200507203235
Sequoia High School Building A and Parking Lot
Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
Trace Elementary School20200508202655
Trace Elementary School
Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
Howard Elementary School20200609170856
Howard Elementary School
Howard Elementary School is a new technology immersion school in Eugene, Oregon, with an emphasis on integrating new technolo...
Harker School20200609171125
Harker School
The New Harker School Performing Arts Center and Gymnasium located on the Upper School Campus in San Jose opened to great fan...
Menlo Atherton High School20200609171604
Menlo Atherton High School
This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Pilarcitos Continuation School20200609182130
Pilarcitos Continuation School
The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Hatch Elementary School20200609183142
Hatch Elementary School
Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Cunha Middle School20200609183459
Cunha Middle School
Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Peabody Stadium20201119174616
Peabody Stadium
Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin provided full structural engi...
Oak Grove Elementary School20230623162304
Oak Grove Elementary School
Hohbach-Lewin Eugene provided structural engineering design for Oak Grove Elementary school, a newly constructed campus for t...
El Rodeo Elementary School20241009181427
El Rodeo Elementary School
The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to...
Del Oro High School20241101212636
Del Oro High School
Del Oro High School features a brand new campus in Bakersfield that contains an admin building, performing arts center, gym, ...
Load more