Historic Hoover Middle School

Historic Hoover Middle School

San Jose, California

This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based seismic design methods per the FEMA 273 and ATC-40 guidelines as permitted by Division III-R of the California Building Code. These methods allowed preservation of the buildings historic fabric, which is highly valued by the community, and also yielded significant savings in construction cost for the San Jose Unified School District, which made it feasible for the project to proceed. Testing of existing construction materials was undertaken to meet DSA requirements as well as to obtain accurate values for analysis. The architect for the project was the Steinberg Group; the general contractor was Toeniskoetter & Breeding, Inc. both of San Jose, CA.

More Projects Like This

Capuchino High School20200507200419

Capuchino High School

Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Abgenix20200507201830

Abgenix

Hohbach-Lewin, Inc. provided full structural engineering design services for the build-out of this $80 million office/product...
Stanford University, Crothers Memorial Hall20200507202615

Stanford University, Crothers Memorial Hall

By utilizing performance based techniques, Hohbach-Lewin was able to devise a scheme which eliminated the need for both of th...
Marin Executive Center20200507202728

Marin Executive Center

The retrofit solution largely consisted of the construction of exterior buttresses which served the dual function of providin...
Santa Ana State Office Building20200507202754

Santa Ana State Office Building

Four distinctly different seismic retrofit strategies were investigated, with the exterior concrete buttress shear wall schem...
Stent Hall, Menlo School20200507202808

Stent Hall, Menlo School

This existing 3-story historic concrete mansion now functions as the administration building for Menlo School. To seismically...
Glendale City Center20200507202827

Glendale City Center

A dynamic analysis was performed on this structure in order to accurately model the structure’s expected performance when exp...
Phelan Building20200507202850

Phelan Building

Hohbach-Lewin, Inc. performed a non-linear performance based analysis of this historic 1908 San Francisco landmark structure....
Safeway Expansion and Renovation20200508202851

Safeway Expansion and Renovation

The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this extensive renovation proj...
El Rodeo Elementary School20241009181427

El Rodeo Elementary School

The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to...
Load more