Hohbach-Lewin has prepared structural evaluations for dozens of mid and high rise office buildings located in areas of high seismicity on the west coast. Studies usually require PML/SEL evaluations, seismic lateral force resisting system review analysis and assessment with accompanying seismic retrofit recommendations as appropriate. A dynamic analysis was performed on this structure in order to accurately model the structure’s expected performance when exposed to a suite of ground motions resulting from activity on multiple known faults with varying proximity to the building site.

More Projects Like This

Data Centers20200507193805

Data Centers

Hohbach-Lewin, Inc. has provided civil and structural engineering design services for several Silicon Valley mission critical...
Capuchino High School20200507200419

Capuchino High School

Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
401 Castro Street20200507201738

401 Castro Street

This new 30,000 square foot, three story office building includes two levels of subterranean parking. The structural system u...
Abgenix20200507201830

Abgenix

Hohbach-Lewin, Inc. provided full structural engineering design services for the build-out of this $80 million office/product...
Citrix20200507201902

Citrix

Hohbach-Lewin, Inc. provided structural design services for the build-out of this 50,000 square foot, steel braced-frame offi...
Crossing/90020200507201932

Crossing/900

Hohbach-Lewin, Inc., while working with the steel fabricator for the project, assisted in the complete redesign of the buildi...
Cupertino Town Center20200507201958

Cupertino Town Center

Hohbach-Lewin provided structural engineering design services for the entire project which also included a seven-story, post ...
NeoCenter Medical Office Building20200507202055

NeoCenter Medical Office Building

This new 35,000 square foot, three story medical office building includes a level of subterranean parking and is located adja...
Stanford University, Crothers Memorial Hall20200507202615

Stanford University, Crothers Memorial Hall

By utilizing performance based techniques, Hohbach-Lewin was able to devise a scheme which eliminated the need for both of th...
Historic Hoover Middle School20200507202700

Historic Hoover Middle School

This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based...
Marin Executive Center20200507202728

Marin Executive Center

The retrofit solution largely consisted of the construction of exterior buttresses which served the dual function of providin...
Santa Ana State Office Building20200507202754

Santa Ana State Office Building

Four distinctly different seismic retrofit strategies were investigated, with the exterior concrete buttress shear wall schem...
Stent Hall, Menlo School20200507202808

Stent Hall, Menlo School

This existing 3-story historic concrete mansion now functions as the administration building for Menlo School. To seismically...
Phelan Building20200507202850

Phelan Building

Hohbach-Lewin, Inc. performed a non-linear performance based analysis of this historic 1908 San Francisco landmark structure....
Capital Milling20200507203738

Capital Milling

The Capitol Milling complex began as a flour mill and the first installation may have been the very first building constructe...
Safeway Expansion and Renovation20200508202851

Safeway Expansion and Renovation

The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this extensive renovation proj...
Brokaw and Bering20201007193503

Brokaw and Bering

Consisting of (3) office buildings along the Highway 101 corridor, these structures provide much needed office space in Silic...
441 Page Mill20210817162129

441 Page Mill

This eye catching, mixed-use, 3-story building near the busy Palo Alto intersection of Page Mill and El Camino was yet anothe...
El Rodeo Elementary School20241009181427

El Rodeo Elementary School

The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to...