El Rodeo Elementary School

El Rodeo Elementary School

Beverly Hills, California

The $165M reconstruction, modernization, and seismic upgrade of the El Rodeo Elementary School was completed and re-opened to students for the 24-25 academic school year school.

The site consisted primarily of five reinforced concrete shear wall buildings – the first three built in 1927 and the final two in 1960. The campus had been shuttered in 2018 due to identified seismic safety concerns, a myriad of ADA issues and antiquated building systems throughout in dire need of modernization and updating to meet the current and future needs of BHUSD students and faculty.

The campus includes a 250-person theater, beautiful interior WPA era murals from the time of its original construction, a beaux arts dome at the grand building entrance, and exterior tile throughout the entire façade. These buildings are well worth investing in, preserving, and saving as a treasured asset for the community for generations to come.

Architect: HMC Architects
Contractor: Pro West
Construction Completed: August 2024
Construction Cost: $165 million

19th and Harrison20241101235728

19th and Harrison

19th and Harrison multi-unit residential project consists of a Type III  building over two levels of concrete parking and ret...
The Maxwell20241101234207

The Maxwell

The Maxwell is a mixed-use facility that is comprised of 5,000 square foot of commercial frontage along Mathilda with a resid...
Del Oro High School20241101212636

Del Oro High School

Del Oro High School features a brand new campus in Bakersfield that contains an admin building, performing arts center, gym, ...
College of the Canyons20241101210821

College of the Canyons

Hohbach-Lewin provided structural engineering design for the Takeda Science and Lecture Building and the Student Services Bui...
Passive House – 17 Mile Drive20241101204628

Passive House – 17 Mile Drive

This project is one of a kind in the area for energy efficiency, utilizing air sealing, conditioned crawl spaces, and high pe...
Saint Catherine of Alexandria20241101203705

Saint Catherine of Alexandria

This project involved a renewal and remodel of the existing church building, characterized by a wood framed roof and partiall...
South Eugene Family YMCA20241101202609

South Eugene Family YMCA

The new South Eugene YMCA is not just a gym, it’s a vibrant community center that brings people of all ages together. The Hoh...
The Ponds on Alexander20241101201444

The Ponds on Alexander

The Ponds on Alexander consists of four high-end multi-unit residential buildings, a community clubhouse and pool, near Delta...
Evergreen Family Medicine20241101200147

Evergreen Family Medicine

Evergreen Family Medicine facility provides medical care throughout the greater Sutherlin area. This 18,000sf state-of-the-ar...
One Adrian20241009193606

One Adrian

One Adrian Apartments is a large multi-unit residential project, type III over two levels of elevated concrete....
Parker Apartments – Shoring20241008030558

Parker Apartments – Shoring

The Parker residential and retail mixed use development, designed by LPAS Architecture is a unique development requirement fo...
231 Grant – Educator Workforce Housing20241004234336

231 Grant – Educator Workforce Housing

This four story muti-unit mixed use housing project promises to create a positive impact for local educators and staff in the...
Parker Apartments20240930162504

Parker Apartments

The Parker residential and retail mixed use development, designed by LPAS Architecture is a unique development requirement fo...
The Dwight Apartments20240930160559

The Dwight Apartments

The Dwight Apartments is a 6-story structure includes 99 units of Type III wood framed construction supported on a concrete p...
Encasa Living20240930155303

Encasa Living

Encasa Living is a 365 unit apartment building complex, along with associated concrete parking structures (636 stalls), desig...
Verano on the Boulevard20240930153720

Verano on the Boulevard

Verano on the Boulevard comprises 150 residential apartment units over a single level sub-grade concrete parking structure wh...
The Addison20240930152045

The Addison

The four story, Type V, wood framed superstructure includes a large roof top lounge which offers views of the Golden Gate, Ba...
Avenue 64 Apartments20240927232747

Avenue 64 Apartments

Designed by Steinberg Architects of San Francisco, Avenue 64 is located at the corner of 64th and Christie streets on a site ...
ADU – Lois Lane20240927225905

ADU – Lois Lane

This compact little home is a great option for adding more living space on a lot with limited area for expansion....
ADU – Seale20240927225639

ADU – Seale

A 790 square foot, accessory dwelling unit that will includes cathedral ceiling, composite shingle roofing, and two wood trel...
ADU – University20240927220507

ADU – University

A 238 square foot, accessory dwelling unit that includes a loft space and vaulted ceilings....
ADU – Chimalus20240927212353

ADU – Chimalus

A conversion of the existing 226 square foot garage to an accessory dwelling unit including a 180 square foot addition....
ADU – Santa Rita20240927205316

ADU – Santa Rita

This project is an existing 275 square foot garage conversion to an ADU....
Carmel, The Village20240925182952

Carmel, The Village

This 400,000-sf mixed-use development also includes 30,000-sf of retail space and was structurally designed by Hohbach-Lewin,...
The Nel Permanent Supportive Housing20240915172605

The Nel Permanent Supportive Housing

This 45 unit permanent supportive housing complex is dedicated to serving individuals experiencing chronic homelessness, prov...
Sage Commons20240914181407

Sage Commons

Sage Commons is a 3-story 36,000 sf wood framed structure serving individuals experiencing chronic homelessness. Located in S...
Capitol 65020240730202921

Capitol 650

This Lennar Multi-Family Residential development, designed by KTGY Architects and constructed by Western National Builders, i...
Market District Commons20240724001425

Market District Commons

Market District Commons is a five-story 55,000 SF building comprises 4 levels of wood framed construction supported on a post...
The Donald Lamb Building20240328013448

The Donald Lamb Building

The Lamb Building is a four story mixed use building, consisting of ground floor commercial space and 35 one bedroom affordab...
Bayview Heights Affordable and Veterans Housing20240224005343

Bayview Heights Affordable and Veterans Housing

Bayview Heights is a three-story 47,000sf wood framed building that provides permanent supportive housing for individuals and...
The Myrtlewood20231123233846

The Myrtlewood

The Myrtlewood is a four-story wood framed building consisting of 35 one-bedroom units of affordable housing in downtown Spri...
Oak Grove Elementary School20230623162304

Oak Grove Elementary School

Hohbach-Lewin Eugene provided structural engineering design for Oak Grove Elementary school, a newly constructed campus for t...
Avalon Bay Walnut Creek II20211209191538

Avalon Bay Walnut Creek II

This six-story building located in Walnut Creek, includes a Type III super structure over a large ground level retail space a...
441 Page Mill20210817162129

441 Page Mill

This eye catching, mixed-use, 3-story building near the busy Palo Alto intersection of Page Mill and El Camino was yet anothe...
Peabody Stadium20201119174616

Peabody Stadium

Located in Santa Barbara, Peabody Stadium is a new 2,300 seat grandstand in which Hohbach-Lewin provided full structural engi...
Cunha Middle School20200609183459

Cunha Middle School

Nestled in the charming and scenic coastal town of Half Moon Bay. The project included adjacent tennis courts, patio area, e...
Hatch Elementary School20200609183142

Hatch Elementary School

Hatch Elementary School located in Half Moon Bay comprised of Campus Modernization of all the classrooms and multipurpose bui...
Pilarcitos Continuation School20200609182130

Pilarcitos Continuation School

The new Pilarcitos Continuation School with comprised of 3 new buildings, sport court area, common outside area, parking lot,...
Lane Community College20200609174059

Lane Community College

An extensive renovation of Lane Community College’s 97,000 SF Center Building was completed in 2016 to create the Center for ...
Menlo Atherton High School20200609171604

Menlo Atherton High School

This two-story classroom building plus basement, encompasses approximately 38,000 square feet. The superstructure is constru...
Harker School20200609171125

Harker School

The New Harker School Performing Arts Center and Gymnasium located on the Upper School Campus in San Jose opened to great fan...
Howard Elementary School20200609170856

Howard Elementary School

Howard Elementary School is a new technology immersion school in Eugene, Oregon, with an emphasis on integrating new technolo...
Monterey Peninsula College Bridge20200609162250

Monterey Peninsula College Bridge

When Monterey Peninsula College needed to replace a wood framed pedestrian bridge in the heart of their campus they turned to...
Safeway Expansion and Renovation20200508202851

Safeway Expansion and Renovation

The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this extensive renovation proj...
Trace Elementary School20200508202655

Trace Elementary School

Hohbach-Lewin, Inc. created a 3-D REVIT model of this complex wood framed 2-story classroom building....
Pioneer Bookstore, CSU East Bay20200508180745

Pioneer Bookstore, CSU East Bay

The building is sited over an existing loading dock between the student union and library. The design features a full height ...
Stanford Roble Gymnasium20200507203612

Stanford Roble Gymnasium

Structural challenges included qualifying and improving the existing arcades and strengthening the existing diaphragms, while...
Santa Barbara Community College20200507203541

Santa Barbara Community College

The structural framing system consists of concrete filled metal decking supported by a structural steel frame. It is braced b...
Mission Community College Health and Wellness Center20200507203506

Mission Community College Health and Wellness Center

The main program includes: a Fitness Studio, Dance Studio, Weight Training Facility, and a Specialized Equipment Lab (for Ada...
College of Canyons Science Building20200507203442

College of Canyons Science Building

The project consists of a new science and lecture building, four stories high and approximately 47,000SF of new construction....
Sequoia High School Building A and Parking Lot20200507203235

Sequoia High School Building A and Parking Lot

Hohbach-Lewin provided civil and structural engineering design on a new science classroom wing, portable classrooms, new park...
Sequoia High School Tea Garden20200507203209

Sequoia High School Tea Garden

Hohbach-Lewin, Inc has been working with Sequoia Union High School District for many years. ...
Mabel Mattos Elementary20200507203146

Mabel Mattos Elementary

Phase 1 included 2 new classroom buildings, play area, parking lot and McCandless Roadway improvements. We worked closely wit...
Phelan Building20200507202850

Phelan Building

Hohbach-Lewin, Inc. performed a non-linear performance based analysis of this historic 1908 San Francisco landmark structure....
Glendale City Center20200507202827

Glendale City Center

A dynamic analysis was performed on this structure in order to accurately model the structure’s expected performance when exp...
Stent Hall, Menlo School20200507202808

Stent Hall, Menlo School

This existing 3-story historic concrete mansion now functions as the administration building for Menlo School. To seismically...
Santa Ana State Office Building20200507202754

Santa Ana State Office Building

Four distinctly different seismic retrofit strategies were investigated, with the exterior concrete buttress shear wall schem...
Marin Executive Center20200507202728

Marin Executive Center

The retrofit solution largely consisted of the construction of exterior buttresses which served the dual function of providin...
Historic Hoover Middle School20200507202700

Historic Hoover Middle School

This 1930’s vintage concrete building has been retrofitted and returned to public educational use utilizing performance-based...
Stanford University, Crothers Memorial Hall20200507202615

Stanford University, Crothers Memorial Hall

By utilizing performance based techniques, Hohbach-Lewin was able to devise a scheme which eliminated the need for both of th...
UCLA Harbor Medical Center Parking Garage20200507202320

UCLA Harbor Medical Center Parking Garage

Hohbach-Lewin, Inc. provided structural design for this new 500 car pre-cast concrete parking garage constructed with pre-cas...
Abgenix20200507201830

Abgenix

Hohbach-Lewin, Inc. provided full structural engineering design services for the build-out of this $80 million office/product...
St. Francis Performing Arts Center20200507200744

St. Francis Performing Arts Center

The fly-space can accommodate as many as thirty set changes; the orchestra pit platform has been designed with hydraulic lift...
Sequoia High School Gymnasium20200507200707

Sequoia High School Gymnasium

The new gymnasium, designed to seat the entire 1400 person student body, has been designed to achieve USGBC LEED Gold status....
Lincoln High School20200507200616

Lincoln High School

The modernization scope renovated the Theater Building, while the new construction included a new two story classroom buildin...
La Entrada MS Gymnasium20200507200536

La Entrada MS Gymnasium

This 10,000 square foot high school sized gymnasium was designed utilizing long span steel trusses for roof framing members a...
Fremont High School Modernization & Expansion20200507200501

Fremont High School Modernization & Expansion

In addition to a campus-wide modernization project at Sunnyvale’s Fremont High School, Hohbach-Lewin provided the structural ...
Capuchino High School20200507200419

Capuchino High School

Hohbach-Lewin provided the structural design for this new $25M two-story classroom and administration building designed by Bi...
Berryessa Youth Center20200507200340

Berryessa Youth Center

This 20,000 square foot facility includes a 1,200 seat gymnasium, three classroom size activity rooms, conference rooms and A...
Abraham Lincoln High School20200507200308

Abraham Lincoln High School

The project included a new $15M, two-story steel moment resisting frame building which replaces 26 tired and time worn re-loc...
Stanford Institute for Economic Policy Research20200507195827

Stanford Institute for Economic Policy Research

Hohbach-Lewin, Inc. provided structural engineering services for the recently opened John A. & Cynthia Fry Gunn Building for ...
Santa Clara University – College of Arts, Sciences and Communication20200507195657

Santa Clara University – College of Arts, Sciences and Communication

A new 65,000 SF, two-story steel braced frame building on the Santa Clara University campus....
Oregon Coast Community College20200507195609

Oregon Coast Community College

The Central County Campus is a LEED Certified, $16.5 million, 77,000 SF facility in Newport, Oregon....
CSU East Bay, Pioneer Heights Student Housing, Phases II & III20200507195521

CSU East Bay, Pioneer Heights Student Housing, Phases II & III

Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Funded by Proposition 47, thi...
Hyundai of Elk Grove20200507191519

Hyundai of Elk Grove

Hohbach-Lewin structural and civil engineering teamed up with Wagner Architecture Group and Tilton Pacific Construction to pr...
Load more