Citrix
Santa Clara, California
Hohbach-Lewin, Inc. provided structural design services for the build-out of this 50,000 square foot, steel braced-frame office building. Among the building improvements was the incorporation of a column free space on the first level. In order to provide this column free space, it was necessary to remove the first level of an existing five-story, interior wide flange column. Gravity loads were transferred to adjacent columns via the introduction of a story high steel truss between the second and third floors. This truss utilized the existing third floor framing for the top chord of the transfer truss. The project general contractor was San Jose Construction; the steel fabricator was SOS Steel.
More Projects Like This
- All
- Academic
- Academic-Higher Education
- Accessory Dwelling Unit
- Affordable Housing
- Civil Engineering
- Concrete Mid-Rise
- Data
- Health Care
- Higher Education
- Hospitality
- K-12 Schools
- LEED Certified
- Mixed-Use
- Multi-Residential
- Municipal
- Northern California
- Office Buildings
- Oregon
- Parking Structures
- Protective Services
- Residential
- Retail
- Seismic Retrofits
- Shoring
- Single Family
- Southern California
- Special Projects
- Structural Engineering
Data Centers20200507193805
Data Centers
Hohbach-Lewin, Inc. has provided civil and structural engineering design services for several Silicon Valley mission critical...
401 Castro Street20200507201738
401 Castro Street
This new 30,000 square foot, three story office building includes two levels of subterranean parking. The structural system u...
Abgenix20200507201830
Crossing/90020200507201932
Crossing/900
Hohbach-Lewin, Inc., while working with the steel fabricator for the project, assisted in the complete redesign of the buildi...
Cupertino Town Center20200507201958
Cupertino Town Center
Hohbach-Lewin provided structural engineering design services for the entire project which also included a seven-story, post ...
NeoCenter Medical Office Building20200507202055
NeoCenter Medical Office Building
This new 35,000 square foot, three story medical office building includes a level of subterranean parking and is located adja...
Marin Executive Center20200507202728
Marin Executive Center
The retrofit solution largely consisted of the construction of exterior buttresses which served the dual function of providin...
Santa Ana State Office Building20200507202754
Santa Ana State Office Building
Four distinctly different seismic retrofit strategies were investigated, with the exterior concrete buttress shear wall schem...
Stent Hall, Menlo School20200507202808
Stent Hall, Menlo School
This existing 3-story historic concrete mansion now functions as the administration building for Menlo School. To seismically...
Glendale City Center20200507202827
Glendale City Center
A dynamic analysis was performed on this structure in order to accurately model the structure’s expected performance when exp...
Phelan Building20200507202850
Phelan Building
Hohbach-Lewin, Inc. performed a non-linear performance based analysis of this historic 1908 San Francisco landmark structure....
Capital Milling20200507203738
Capital Milling
The Capitol Milling complex began as a flour mill and the first installation may have been the very first building constructe...
Brokaw and Bering20201007193503
Brokaw and Bering
Consisting of (3) office buildings along the Highway 101 corridor, these structures provide much needed office space in Silic...
441 Page Mill20210817162129
441 Page Mill
This eye catching, mixed-use, 3-story building near the busy Palo Alto intersection of Page Mill and El Camino was yet anothe...
Load more