AutoNation’s Smyth European Mercedes Parking Garage
San Jose, California
This three-story 73,000 sq ft parking garage was built to house onsite automobile storage for the dealership. The structural system utilized spancrete pre-cast gravity floor system. The building’s walls and exterior cladding were constructed of pre-cast concrete tilt-up walls.
More Projects Like This
- All
- Academic
- Academic-Higher Education
- Accessory Dwelling Unit
- Affordable Housing
- Civil Engineering
- Concrete Mid-Rise
- Data
- Health Care
- Higher Education
- Hospitality
- K-12 Schools
- LEED Certified
- Mixed-Use
- Multi-Residential
- Municipal
- Northern California
- Office Buildings
- Oregon
- Parking Structures
- Protective Services
- Residential
- Retail
- Seismic Retrofits
- Shoring
- Single Family
- Southern California
- Special Projects
- Structural Engineering
Pillar Point Harbor Village20200507200037
Pillar Point Harbor Village
Hohbach-Lewin collaborated with architectural firm Jacobsen & Associates to design the 90,000 sf 3-story Oceano Hotel Buildin...
Creek Bridge Village20200507200904
Creek Bridge Village
This project includes Multi-story luxury apartments over Retail spaces....
Crescent Village Town Center East and West Villages20220507200931
Crescent Village Town Center East and West Villages
The first and second floor levels are concrete post-tensioned slabs that support the 4-levels of wood framed housing above....
BMW of Mountain View20200507202212
BMW of Mountain View
This new three-story 120,000 square foot parking garage will house onsite automobile storage for the dealership. The structur...
City Toyota Car Dealership20200507202245
City Toyota Car Dealership
This new car dealership consists of a two story, 41,000 SF showroom with a four story, 168,000 square foot parking structure ...
Lexus Serramonte20200507202301
Lexus Serramonte
Using a design-build delivery platform, San Jose Construction worked closely with Hohbach-Lewin and Avanessian Associates to ...
UCLA Harbor Medical Center Parking Garage20200507202320
UCLA Harbor Medical Center Parking Garage
Hohbach-Lewin, Inc. provided structural design for this new 500 car pre-cast concrete parking garage constructed with pre-cas...
Charleston Plaza20200507202412
Charleston Plaza
This new, 130,000 square foot center in Mountain View, includes a new Best Buy, REI and Bed Bath & Beyond as its major tenant...
Nut Tree Retail Center20200507202448
Nut Tree Retail Center
This 325,000 square foot retail and office “power center” sits on 30 acres where the renowned Nut Tree road stop previously s...
Pacific Commons Regional Retail Center20200507202504
Pacific Commons Regional Retail Center
Hohbach-Lewin completed the design for this new 400,000 square foot “super fast-track” retail center in under three months fr...
The Plant20200507202521
Vons20200507202549
Safeway Expansion and Renovation20200508202851
Safeway Expansion and Renovation
The entire project team utilized 3-D modeling software, REVIT, to produce working drawings for this extensive renovation proj...
UCSF Third St. Parking Garage Façade20200609163658
UCSF Third St. Parking Garage Façade
Located in the heart of the thriving Mission Bay neighborhood of San Francisco across the street from the new Chase Center, t...
Brokaw Plaza Shopping Center20200609183805
Brokaw Plaza Shopping Center
The former site was a semiconductor facility, that had contaminated soils. Hohbach-Lewin work with the environmental engineer...
Chappo Dining Facility Parking Structure20201007194112
Chappo Dining Facility Parking Structure
The project consisted of construction of a three-level parking structure, 180 Stalls for the 33,000 SF Enlisted Dining Facili...
Cupertino Town Center Parking Structure20201007194348
Cupertino Town Center Parking Structure
Located at 19500 Vallco Parkway, this seven level parking structure, five stories above grade and two stories below grade, is...
Mosaic Parking Structure20201007194754
Mosaic Parking Structure
The multi-storied structure, located on North First Street adds a total of 307 new parking spaces over five floors....
Peter Pan BMW Service Center20201007195743
Peter Pan BMW Service Center
The existing warehouse structure was expanded to add the services a bay, Display Center and a drive-in drop off area....
Stevens Creek Volkswagon20201007200047
Stevens Creek Volkswagon
In conjunction with the contractors, Hohbach-Lewin was able to develop a structural system that met the owner’s aggressive co...
CityLine Sunnyvale AMC and Whole Foods20201007200728
CityLine Sunnyvale AMC and Whole Foods
Included in this multiuse 36 acre development is a new two story retail facility and associated renovated parking structure w...
Station 1300 Shoring20201007201747
Station 1300 Shoring
To accomplish excavating the 450,000 Cubic Yards of dirt, temporary shoring was required to stabilize neighboring structures,...
Spenger’s and 4th Street Retail20201119162019
Spenger’s and 4th Street Retail
Located in a trendy shopping district of Berkeley, CA, the 4th Street Shops as they are now called was another project that g...
Load more