Data Centers

Data Centers

Hohbach-Lewin, Inc. has provided civil and structural engineering design services for several Silicon Valley mission critical, co-location or single user data centers. Projects have included a new ground up construction, expansions of existing data centers or conversions of existing industrial buildings to data center usage.

401 Castro Street20200507201738

401 Castro Street

This new 30,000 square foot, three story office building includes two levels of subterranean parking. The structural system u...
Abgenix20200507201830

Abgenix

Hohbach-Lewin, Inc. provided full structural engineering design services for the build-out of this $80 million office/product...
Citrix20200507201902

Citrix

Hohbach-Lewin, Inc. provided structural design services for the build-out of this 50,000 square foot, steel braced-frame offi...
Crossing/90020200507201932

Crossing/900

Hohbach-Lewin, Inc., while working with the steel fabricator for the project, assisted in the complete redesign of the buildi...
Cupertino Town Center20200507201958

Cupertino Town Center

Hohbach-Lewin provided structural engineering design services for the entire project which also included a seven-story, post ...
NeoCenter Medical Office Building20200507202055

NeoCenter Medical Office Building

This new 35,000 square foot, three story medical office building includes a level of subterranean parking and is located adja...
Marin Executive Center20200507202728

Marin Executive Center

The retrofit solution largely consisted of the construction of exterior buttresses which served the dual function of providin...
Santa Ana State Office Building20200507202754

Santa Ana State Office Building

Four distinctly different seismic retrofit strategies were investigated, with the exterior concrete buttress shear wall schem...
Stent Hall, Menlo School20200507202808

Stent Hall, Menlo School

This existing 3-story historic concrete mansion now functions as the administration building for Menlo School. To seismically...
Glendale City Center20200507202827

Glendale City Center

A dynamic analysis was performed on this structure in order to accurately model the structure’s expected performance when exp...
Phelan Building20200507202850

Phelan Building

Hohbach-Lewin, Inc. performed a non-linear performance based analysis of this historic 1908 San Francisco landmark structure....
Capital Milling20200507203738

Capital Milling

The Capitol Milling complex began as a flour mill and the first installation may have been the very first building constructe...
Brokaw and Bering20201007193503

Brokaw and Bering

Consisting of (3) office buildings along the Highway 101 corridor, these structures provide much needed office space in Silic...
Altmeyer Social Security Administration Building20201016153032

Altmeyer Social Security Administration Building

Seismic, blast, progressive collapse, and vehicle ramming hazards were mitigated for a total building rehabilitation of the e...
Combined Test Force Compound – Edwards Air Force Base20201016154342

Combined Test Force Compound – Edwards Air Force Base

Anti-Terrorism and Force Protection (AT/FP) technical design efforts of approximately 275,000-sf of existing multi-story hang...
Newark Liberty International Airport Terminal A Redevelopment20201016154820

Newark Liberty International Airport Terminal A Redevelopment

The new facility was designed to mitigate against a host of terrorist attacks, including high-explosive and vehicular ramming...
Purple Line Subway Extension Phase 0320201016155113

Purple Line Subway Extension Phase 03

A blast evaluation and design effort was provided for buried mission critical utilities and associated junction structures at...
Ronald V. Dellums Federal Building and U.S. Courthouse20201016155616

Ronald V. Dellums Federal Building and U.S. Courthouse

The 1,020,000 square feet facility was evaluated against critical terrorist threats relative to Interagency Security Committe...
U.S. Embassy Rome Compound20201016155952

U.S. Embassy Rome Compound

The U.S. Department of State required security and blast performance expertise to facilitate high-level planning as to existi...
Expanded Optometry Clinic – St. Cloud VA Health Care System20201016160410

Expanded Optometry Clinic – St. Cloud VA Health Care System

The St. Cloud VA Health Care System’s optometry services capacity was increased through expansion of the existing Building 29...
West Block Rehabilitation Project20201016160731

West Block Rehabilitation Project

The West Block facility contains the House of Commons chambers and legislative offices and required anti-terrorism design to ...
441 Page Mill20210817162129

441 Page Mill

This eye catching, mixed-use, 3-story building near the busy Palo Alto intersection of Page Mill and El Camino was yet anothe...