This three-story multi-unit building consists of two levels of wood framing over retail and under ground parking. Both the parking lid and retail podium were constructed as post-tensioned concrete slabs. The ground level retail spaces include mezzanines. These 30 for sale units were constructed as the only residential component within this large retail center. Construction cost was approximately $12M.
Phase II consists of three new four-story dormitory buildings encompassing 140,000 square feet. Funded by Proposition 47, this project added student housing units for 704 students. This phase also includes a single-story Commons and a Maintenance Building. The project was occupied for the 2006 school year. Phase III will provide two additional four-story housing buildings for an additional 512 students. Total construction cost was $27M
This five-story multi-unit residential building is constructed over two-levels of underground parking. The mixed-use facility constructed by Not-for-Profit Housing developers encompasses 74,000 square feet of Single Residential Occupancy (SRO) and Family Shelter rooms. The facilities include Social Services Offices and related functions on the ground floor. Construction cost was approximately $10M.
This project is the 2nd phase of Arlie & Company’s Urban Village Development in North Eugene. The design and construction incorporates numerous green building features. This developement provides 120,000 SF of apartments, 37,000 SF of retail shops and restaurants, and 40,000 SF of underground parking. Construction consists of below grade concrete basement walls and columns supported by conventional spread footings. The 1st and second floor levels are concrete post-tensioned slabs that support the 4-levels of wood framed housing above.
This complex includes four levels of wood-framed housing and community space supported by a second-story post-tensioned concrete podium. The ground floor space is retail. The development is an environmentally conscious solution to affordable housing by locating the Royal Building in the heart of downtown where the main transit hub encourages urban density and foot traffic.
The project consists of 5 mixed-use buildings located in the center of Salinas. This project includes Multi-story luxury apartments over Retail spaces. This project was constructed for Creek Bridge Homes of Tres Pinos, California. Construction Budget is $10M.
This new apartment complex was constructed in 2005-06. The project consisted of 170 units within 16 buildings. The total building area is 157,000 square feet and the construction cost was $24.0M.
Photos courtesy of the Architectural Office of Christiani Johnson of San Francisco.
This seven building apartment complex, originally constructed in the early 80's required extensive structural renovation due to massive wood decay. All exterior windows and affected finish material were removed so that decayed structural members could be repaired. Exterior decks were upgraded and the buildings were seismically enhanced. The structural repair work was reviewed and directed by on-site Hohbach-Lewin personnel so that disruption to building tenants was minimized. Services were provided directly to the owner.